Integrity Construction Contracting Co. – شركة المصداقية للمقاولات الانشائية
LPG storage spheres, petroleum tanks and power plant stacks in Jordan
HRSG and power plant steel structure erection with mobile crane
Gas metering and pressure reduction station piping installed by Integrity
Crawler crane erecting conveyor and stacker structure at a phosphate plant
Steel conveyor gallery and trestles erected at Arab Potash
Storage tanks and process piping completed by Integrity
Heavy lift of an HRSG exhaust duct at a power plant
Integrity Construction Contracting Co. · Jordan

What we do. What we say. & what we say we do.

Mechanical and electromechanical contractor for oil & gas, power plants, conveyor systems, storage tanks and process plants across Jordan since 2008.

LPG spheres, storage tanks & power plant

Integrity crew lifting a scrubber section at a JIFCO fertilizer plant shutdown
2008Since
About Integrity

A local contractor with international standards

Integrity is a Jordanian construction company experienced in power plant, industrial construction and maintenance projects: mechanical construction, storage tanks, piping, pipelines, GRP and FRP.

Our management team has worked side by side with the international companies that built Jordan's energy and industrial base. That gives us international engineering and quality standards, delivered with local knowledge and the safety and environmental discipline our clients require.

Worked alongside GE · Alstom · Siemens · OHL · Arabtec · CCC · GAMA · METKA · Lotte · Kents · Wärtsilä · Petrojet

  1. 2008911 Maintenance & Services

    Founded as a contractor for construction works, consultation and equipment supply.

  2. 2016Integrity Eng. Establishment

    Registered in Aqaba for metal fabrication and construction.

  3. 2018Integrity Construction Contracting Co. W.L.L.

    Restructured with new management, experience and resources.

  4. 2019ISO certified

    ISO 9001:2015, ISO 45001:2018, ISO 14001:2015.

Mission

To provide value-added construction services through a real partnership with our customers at every stage, and to earn lasting relationships by exceeding their expectations through the performance of every member of our team.

Vision

To raise the Jordanian construction market to a professional standard of quality and safety, and to be the leader in integrity.

Services

What we build and maintain

We carry the full construction scope: construction management, safety officers, foremen and crew leaders, machinery and consumables, cranes, forklifts and lifting equipment. From a single shutdown task to a turn-key EPC package.

Storage Tanks – Construction & maintenance in Jordan by Integrity
Construction & maintenance

Storage Tanks

API 650 / API 620 tanks from design and plate fabrication to erection, hydrotest, lining and coating, including our 26 m diameter Zarqa tank.

Mechanical Equipment – Installation & maintenance in Jordan by Integrity
Installation & maintenance

Mechanical Equipment

Gas engines, boilers, ball mills, belt filters, thickeners, scrubbers, stackers and reclaimers: erection, alignment and commissioning.

Fabrication – Workshop & on-site in Jordan by Integrity
Workshop & on-site

Fabrication

Spools, ducts, chutes, hoppers, silos and structural steel in our fabrication shop and on site.

Piping – Fabrication & erection in Jordan by Integrity
Fabrication & erection

Piping

Carbon steel, stainless SS316, duplex and P91 alloy piping; HP/LP gas, process, ammonia and fire-fighting lines with full NDT.

Power MV / LV – Transformers, switchgear, cabling in Jordan by Integrity
Transformers, switchgear, cabling

Power MV / LV

MV/LV switchgear and transformer installation, cable laying, glanding and termination.

Instrumentation – Installation & loop checks in Jordan by Integrity
Installation & loop checks

Instrumentation

Field instruments, impulse lines, cable trays and loop testing for process plants.

Infrastructure – Networks & utilities in Jordan by Integrity
Networks & utilities

Infrastructure

District cooling, utility and fire-fighting networks in GRP, HDPE, ductile iron and uPVC.

MEP – Mechanical, electrical, plumbing in Jordan by Integrity
Mechanical, electrical, plumbing

MEP

HVAC chillers, AHU and FCU, ducting, plumbing, medical gases and fire-fighting for industrial and commercial buildings.

Thermal Spray – On-site metallization in Jordan by Integrity
On-site metallization

Thermal Spray

Aluminium and zinc arc-spray coating applied in place, as a galvanizing alternative for tanks, vessels and structures.

Coating, Insulation & Cladding – Sandblasting and painting in Jordan by Integrity
Sandblasting and painting

Coating, Insulation & Cladding

Abrasive blasting to Sa 2½, multi-coat painting systems, hot and cold insulation with aluminium cladding.

GRP · HDPE · CPVC – Piping and tanks in Jordan by Integrity
Piping and tanks

GRP · HDPE · CPVC

Supply, lamination, butt-fusion and installation of non-metallic piping and tanks for corrosive service.

Rubber Lining – Workshop & on-site in Jordan by Integrity
Workshop & on-site

Rubber Lining

Rubber lining of tanks, ducts, scrubbers, vessels and spools for acid and abrasive slurry service.

Thermal spray metallization applied on site to a steel pipe
FIRST CERTIFIED APPLICATOR IN JORDAN

Thermal spray metallization

Arc-sprayed aluminium and zinc coatings: a reliable, faster and lower-cost alternative to hot-dip galvanizing, applied in place on tanks, vessels, boilers and steel structures, with technical support from our partner MEC (India).

Hot-dip galvanizingThermal spray
WhereAt the galvanizing plantOn site, in place
Part sizeLimited by the bathNo limit
LogisticsDismantle, ship, reinstallNo dismantling
MetalsZincAl, Zn, SS, Cu
Projects

Recent and completed projects

Work our crews have delivered across Jordan, from Aqaba's industrial port to the phosphate mines at Eshidiya and the potash works at the Dead Sea. Tap a photo to enlarge it.

Oil & GasJul 2025 – present

JGTP Capacity Enhancement Project

Fajer / Petrojet

All process HP/LP piping for the Jordan Gas Transmission Pipeline capacity enhancement.

40,000+ dia-inch of piping

PotashJan 2025 – present

HLP Project – Arab Potash Company

APC / IHPCO

Equipment erection, duct and chute fabrication, steel structure, gas generator, preheaters, bucket elevators, conveyor belts and gas, fuel, water and air piping.

Power PlantsMar 2023 – Jan 2024

Al Mowaqqar Combined Cycle Power Plant

National Chlorine & Soda Industries

Gas engines, boilers, equipment installation, tanks, stacks, piping fabrication and installation, painting and insulation.

22,850 dia-inch of piping

Phosphate & MiningJun – Sep 2024

Stacker & Portal Reclaimer – Installation and Commissioning

TAKRAF Germany – IDMI Phosphate, Eshidiya

Turn-key installation, fabrication and mechanical/electrical commissioning. Portal width 48 m.

Phosphate & MiningMay 2024 – present

1,000 m Land Conveyors

CETEC – IDMI Phosphate, Eshidiya

Full installation, fabrication and mechanical/electrical commissioning of overland conveyors.

Phosphate & MiningAug 2023 – Apr 2024

EPC Phosphate Loading & Scrubbing Station

IDMI Phosphate

Engineering, procurement, fabrication, installation and commissioning of the full conveying system from phosphate receiving to the scrubber.

Phosphate & MiningAug 2023 – Jun 2025

Phosphate Beneficiation Plant – Ball Mill, Belt Filters, Thickener & Pump Station

Metso – IDMI Phosphate

Installation and commissioning of the ball mill, two belt filters and thickener; supply, fabrication and installation of a 1,000 m³/h pump station with metering and a 4,000 m pipeline; water, slurry, air, fuel and chemical lines.

30,850 dia-inch of piping

Phosphate & MiningOct – Dec 2023

Phosphate Scrubber Installation

CEMTEC – IDMI Phosphate

Installation and commissioning of the scrubber with full rubber lining.

Oil & GasAug – Oct 2023

Al Risha Gas Compression Station

Jordan Liquefied Gas Company

Mechanical equipment installation and alignment, piping fabrication and installation, painting.

8,750 dia-inch of piping

PotashJan 2021 – Feb 2022

APC Main Storage Facility

Alown Advanced Company

Electrical and mechanical installation and commissioning of container loading, truck loading, a 35-conveyor belt system, silos, bagging machines and dedusting.

8,000 dia-inch of piping

PotashJun 2020 – Dec 2021

APC Dispatch System

Alown Advanced Company

Electrical and mechanical installation and commissioning of a conveyor system of about 1,000 m.

PotashJan – Jul 2020

APC Main Hangar – 1,000 t Steel

ATCCO

Steel fabrication, sandblasting and painting of a 1,000-ton steel hangar for Arab Potash.

Potash2020

Electro-Mechanical Works in APC Dikes

BAUER International

Fabrication, steel and welding works, silos.

Fertilizer & ChemicalsAug – Dec 2020

3 Portable Conveyors

Indo-Jordan Chemicals

Fabrication and site installation of three portable conveyors.

Fertilizer & Chemicals2018 · 2020 · 2022

JIFCO Major Shutdowns 2018, 2020 & 2022

Jordan India Fertilizer Company

All shutdown activities: equipment installation, insulation and cladding, GRP/FRP/HDPE, welding, piping, cooling tower, bucket elevator.

Fertilizer & ChemicalsNov 2018 – Oct 2019

Phosphoric Acid & Ammonia Export Lines, JPMC to Industrial Port

Técnicas Reunidas

Replacement of the 16" and 4" ammonia line (3,000 m) and the GRP phosphoric acid export line (2,800 m), including jointing, testing and commissioning. 100% RT.

20,200 dia-inch of piping

Fertilizer & ChemicalsMay – Jun 2019

Ammonia Export Line, JPMC to Industrial Port

Técnicas Reunidas

Line replacement including sandblasting and painting, welding, testing and commissioning. 100% RT.

14,850 dia-inch of piping

Fertilizer & ChemicalsJun 2019

JPMC Temporary Fire-Fighting HDPE Network

Técnicas Reunidas

Temporary 1,200 m HDPE fire-fighting network for the export lines.

7,250 dia-inch of piping

Fertilizer & ChemicalsJun – Jul 2019

JPMC Sulfur Store Fire-Fighting Network

Siemens / JPMC

Fabrication, installation, testing and commissioning of the sulfur store fire-fighting network.

3,200 dia-inch of piping

Ports & MarineFeb – Oct 2019

Industrial Jetty Cathodic Protection

Jordan Industrial Ports

Cathodic protection for the new and existing jetty, including marine and electrical works.

Ports & MarineAug – Oct 2019

Ship Loader Rehabilitation & Commissioning

Jordan Industrial Ports

Mechanical rehabilitation, equipment replacement, instrumentation and electrical works, sandblasting and painting.

Fertilizer & ChemicalsJul 2019

Cargill Plant Silos Welding

Provimi Jordan – Cargill

Welding of four 80-ton silos.

Fertilizer & Chemicals2019 & 2022

FAT Duct Replacement, IJC Plant

India-Jordan Chemicals

Replacement of the main FAT duct including cutting, lifting and welding.

Fertilizer & ChemicalsMar 2019

RO Water Line SS316 – Supply & Installation

India-Jordan Chemicals

Supply and installation of the plant RO water network in SS316.

6,750 dia-inch of piping

Power PlantsApr 2019

Aqaba Power Plant HRSG Header Heat Treatment

GE

Post-weld heat treatment of the alloy pipes of the HRSG main header.

Fertilizer & Chemicals2018 – 2020

JIFCO Plant Coating Contract

JIFCO, Ma'an

Coating of tanks, vessels and steel structures across the plant.

Fertilizer & ChemicalsJun – Dec 2018

JIFCO Major Maintenance

JIFCO, Ma'an

Six months of major maintenance works.

Fertilizer & ChemicalsMay 2018

JIFCO-MIL Rubber Lining

JIFCO-MIL

Rubber lining of tanks, ducts and vessels.

Fertilizer & ChemicalsJun – Oct 2018

JIFCO Ball Mill Liner Replacement

JIFCO, Ma'an

Internal liners of Ball Mill A changed in a 4-day shutdown.

Fertilizer & ChemicalsDec 2017

Chlorine Plant Major Shutdown

Bromine Jordan Company

Rehabilitation of the chlorine plant: vessel replacement, piping, GRP piping, SS tank fabrication and scaffolding.

4,300 dia-inch of piping

Power PlantsApr – Oct 2017

Zarqa Combined Cycle Power Plant – Storage Tanks

SEPCOIII – ATCCO

Fabrication and erection of a 26 m diameter storage tank; pipe rack erection.

InfrastructureNov 2016 – May 2017

Saraya Aqaba Resort – Infrastructure Piping

CCC – MAR

Infrastructure piping network in HDPE, GRP and uPVC.

Piping track record & resources

Measured in dia-inches

Piping volume welded, tested and commissioned by our own crews on recent projects, and the equipment we mobilize for them. Welders are qualified to ASME IX with 100% RT where specified.

  • JGTP Capacity EnhancementFajer / Petrojet40,000+
  • IDMI Phosphate Beneficiation PlantMetso30,850
  • Al Mowaqqar CCPPNCSI22,850
  • JPMC Ammonia & Phosphoric Acid Export LinesTécnicas Reunidas20,200
  • JPMC Ammonia Export Line ReplacementTécnicas Reunidas14,850
  • Al Risha Gas Compression StationJLGC8,750
  • APC Main Storage FacilityAlown8,000
  • JPMC Fire-Fighting NetworkTécnicas Reunidas7,250
  • IJC RO Water Line, SS316India-Jordan Chemicals6,750
  • Chlorine Plant ShutdownBromine Jordan4,300
  • JPMC Sulfur Store Fire-FightingSiemens / JPMC3,200

Total dia-inch, carbon steel and stainless steel, per project.

Cranes

  • 180 t crane
  • 250 t cranes
  • 225 t cranes
  • 218 t boom trucks

Welding

  • 12TIG 300 A
  • 18Stick/TIG 400 A
  • 1MIG 500 A
  • 6Diesel welders 500 A
  • 1Gouging machine 500 A

Power & testing

  • 4Generators 50–200 kVA
  • 5Hydrotest pumps 150–250 bar
  • 1Flushing pump 500 GPM
  • 3Air compressors

Tools

  • 3Automatic & portable bevelling machines
  • 4Airless painting machines
  • 4Torque wrenches 50–2,000
  • 19Chain hoists 1.5–10 t
  • 25Fit-up clamps 4–30"
Managing director's track record

Before Integrity

Major projects led by our managing director before founding the company. They shaped how we plan, staff and deliver today.

Amman Strategic Reservoir Terminal tank farm under construction
Amman Strategic Reservoir Terminal: 17 petroleum tanks and 5 LPG spheres.
2015–2016Amman Strategic Reservoir Terminal

17 storage tanks for diesel, gasoline, kerosene and jet fuel, 113,000 m³ in total, plus 5 LPG spheres of 18,000 m³, fire-fighting and slop tanks.

2014–2015Saray Al Aqaba Resort

District cooling network of 5,000 m GRP pipe; HDPE and ductile iron fire-fighting network.

2011–2012Aqaba Container Terminal Expansion

Site management, pile welding and pile painting inshore and offshore.

2011Jordan Bromine Company

4 km GRE brine pipeline; Tetra Bromine unit extension.

2009–2010APC Cold Crystallization Plant

Mechanical equipment, ducting, piping and plant-wide HVAC under Petrojet.

2004–2009Hospitals, hotels & warehouses

USAID hospital renovations, Marriott Amman, Union Tobacco and Al-Deasa: HVAC, fire-fighting, plumbing, medical gases.

Certification & organisation

ISO certified to 2027

Quality, environmental and occupational health & safety management systems certified under UKAC accreditation, covering every service we deliver.

Certified by
International Quality Certification Services UK Ltd (UKAC accredited)
Issued
28 Nov 2024
Valid until
27 Nov 2027
Certificates
24AAC02676Q · 24AAC02677E · 24AAC02678O

Certified scope

  1. Electro-mechanical engineering & construction
  2. Construction of oil & gas, petrochemical, power and water industrial projects
  3. Conveyor belt and material handling (EPC)
  4. Mechanical silos, chutes, ducts, steel fabrication and erection
  5. Storage tank fabrication and erection to API 650 & D
  6. Industrial coating & rubber lining application
  7. Scaffolding erection
  8. Maintenance and rehabilitation of industrial plants