Storage Tanks
API 650 / API 620 tanks from design and plate fabrication to erection, hydrotest, lining and coating, including our 26 m diameter Zarqa tank.
Mechanical and electromechanical contractor for oil & gas, power plants, conveyor systems, storage tanks and process plants across Jordan since 2008.
LPG spheres, storage tanks & power plant

Gas transmission piping, compression stations, CNG and LPG facilities.

Combined cycle, simple cycle and gas-engine plants since 2003.

Overland conveyors, stackers, reclaimers and dispatch systems.

API 650 tanks, terminals and tank farms, up to 26 m diameter.

Integrity is a Jordanian construction company experienced in power plant, industrial construction and maintenance projects: mechanical construction, storage tanks, piping, pipelines, GRP and FRP.
Our management team has worked side by side with the international companies that built Jordan's energy and industrial base. That gives us international engineering and quality standards, delivered with local knowledge and the safety and environmental discipline our clients require.
Worked alongside GE · Alstom · Siemens · OHL · Arabtec · CCC · GAMA · METKA · Lotte · Kents · Wärtsilä · Petrojet
Founded as a contractor for construction works, consultation and equipment supply.
Registered in Aqaba for metal fabrication and construction.
Restructured with new management, experience and resources.
ISO 9001:2015, ISO 45001:2018, ISO 14001:2015.
To provide value-added construction services through a real partnership with our customers at every stage, and to earn lasting relationships by exceeding their expectations through the performance of every member of our team.
To raise the Jordanian construction market to a professional standard of quality and safety, and to be the leader in integrity.







We carry the full construction scope: construction management, safety officers, foremen and crew leaders, machinery and consumables, cranes, forklifts and lifting equipment. From a single shutdown task to a turn-key EPC package.
API 650 / API 620 tanks from design and plate fabrication to erection, hydrotest, lining and coating, including our 26 m diameter Zarqa tank.
Gas engines, boilers, ball mills, belt filters, thickeners, scrubbers, stackers and reclaimers: erection, alignment and commissioning.
Spools, ducts, chutes, hoppers, silos and structural steel in our fabrication shop and on site.
Carbon steel, stainless SS316, duplex and P91 alloy piping; HP/LP gas, process, ammonia and fire-fighting lines with full NDT.
MV/LV switchgear and transformer installation, cable laying, glanding and termination.
Field instruments, impulse lines, cable trays and loop testing for process plants.
District cooling, utility and fire-fighting networks in GRP, HDPE, ductile iron and uPVC.
HVAC chillers, AHU and FCU, ducting, plumbing, medical gases and fire-fighting for industrial and commercial buildings.
Aluminium and zinc arc-spray coating applied in place, as a galvanizing alternative for tanks, vessels and structures.
Abrasive blasting to Sa 2½, multi-coat painting systems, hot and cold insulation with aluminium cladding.
Supply, lamination, butt-fusion and installation of non-metallic piping and tanks for corrosive service.
Rubber lining of tanks, ducts, scrubbers, vessels and spools for acid and abrasive slurry service.

Arc-sprayed aluminium and zinc coatings: a reliable, faster and lower-cost alternative to hot-dip galvanizing, applied in place on tanks, vessels, boilers and steel structures, with technical support from our partner MEC (India).
| Hot-dip galvanizing | Thermal spray | |
|---|---|---|
| Where | At the galvanizing plant | On site, in place |
| Part size | Limited by the bath | No limit |
| Logistics | Dismantle, ship, reinstall | No dismantling |
| Metals | Zinc | Al, Zn, SS, Cu |
Work our crews have delivered across Jordan, from Aqaba's industrial port to the phosphate mines at Eshidiya and the potash works at the Dead Sea. Tap a photo to enlarge it.
Fajer / Petrojet
All process HP/LP piping for the Jordan Gas Transmission Pipeline capacity enhancement.
40,000+ dia-inch of piping
APC / IHPCO
Equipment erection, duct and chute fabrication, steel structure, gas generator, preheaters, bucket elevators, conveyor belts and gas, fuel, water and air piping.
National Chlorine & Soda Industries
Gas engines, boilers, equipment installation, tanks, stacks, piping fabrication and installation, painting and insulation.
22,850 dia-inch of piping
TAKRAF Germany – IDMI Phosphate, Eshidiya
Turn-key installation, fabrication and mechanical/electrical commissioning. Portal width 48 m.
CETEC – IDMI Phosphate, Eshidiya
Full installation, fabrication and mechanical/electrical commissioning of overland conveyors.
IDMI Phosphate
Engineering, procurement, fabrication, installation and commissioning of the full conveying system from phosphate receiving to the scrubber.
Metso – IDMI Phosphate
Installation and commissioning of the ball mill, two belt filters and thickener; supply, fabrication and installation of a 1,000 m³/h pump station with metering and a 4,000 m pipeline; water, slurry, air, fuel and chemical lines.
30,850 dia-inch of piping
CEMTEC – IDMI Phosphate
Installation and commissioning of the scrubber with full rubber lining.
Jordan Liquefied Gas Company
Mechanical equipment installation and alignment, piping fabrication and installation, painting.
8,750 dia-inch of piping
Alown Advanced Company
Electrical and mechanical installation and commissioning of container loading, truck loading, a 35-conveyor belt system, silos, bagging machines and dedusting.
8,000 dia-inch of piping
Alown Advanced Company
Electrical and mechanical installation and commissioning of a conveyor system of about 1,000 m.
ATCCO
Steel fabrication, sandblasting and painting of a 1,000-ton steel hangar for Arab Potash.
BAUER International
Fabrication, steel and welding works, silos.
Indo-Jordan Chemicals
Fabrication and site installation of three portable conveyors.
Jordan India Fertilizer Company
All shutdown activities: equipment installation, insulation and cladding, GRP/FRP/HDPE, welding, piping, cooling tower, bucket elevator.
Técnicas Reunidas
Replacement of the 16" and 4" ammonia line (3,000 m) and the GRP phosphoric acid export line (2,800 m), including jointing, testing and commissioning. 100% RT.
20,200 dia-inch of piping
Técnicas Reunidas
Line replacement including sandblasting and painting, welding, testing and commissioning. 100% RT.
14,850 dia-inch of piping
Técnicas Reunidas
Temporary 1,200 m HDPE fire-fighting network for the export lines.
7,250 dia-inch of piping
Siemens / JPMC
Fabrication, installation, testing and commissioning of the sulfur store fire-fighting network.
3,200 dia-inch of piping
Jordan Industrial Ports
Cathodic protection for the new and existing jetty, including marine and electrical works.
Jordan Industrial Ports
Mechanical rehabilitation, equipment replacement, instrumentation and electrical works, sandblasting and painting.
Provimi Jordan – Cargill
Welding of four 80-ton silos.
India-Jordan Chemicals
Replacement of the main FAT duct including cutting, lifting and welding.
India-Jordan Chemicals
Supply and installation of the plant RO water network in SS316.
6,750 dia-inch of piping
GE
Post-weld heat treatment of the alloy pipes of the HRSG main header.
JIFCO, Ma'an
Coating of tanks, vessels and steel structures across the plant.
JIFCO, Ma'an
Six months of major maintenance works.
JIFCO-MIL
Rubber lining of tanks, ducts and vessels.
JIFCO, Ma'an
Internal liners of Ball Mill A changed in a 4-day shutdown.
Bromine Jordan Company
Rehabilitation of the chlorine plant: vessel replacement, piping, GRP piping, SS tank fabrication and scaffolding.
4,300 dia-inch of piping
SEPCOIII – ATCCO
Fabrication and erection of a 26 m diameter storage tank; pipe rack erection.
CCC – MAR
Infrastructure piping network in HDPE, GRP and uPVC.
Piping volume welded, tested and commissioned by our own crews on recent projects, and the equipment we mobilize for them. Welders are qualified to ASME IX with 100% RT where specified.
Total dia-inch, carbon steel and stainless steel, per project.
Major projects led by our managing director before founding the company. They shaped how we plan, staff and deliver today.

17 storage tanks for diesel, gasoline, kerosene and jet fuel, 113,000 m³ in total, plus 5 LPG spheres of 18,000 m³, fire-fighting and slop tanks.
District cooling network of 5,000 m GRP pipe; HDPE and ductile iron fire-fighting network.
Site management, pile welding and pile painting inshore and offshore.
4 km GRE brine pipeline; Tetra Bromine unit extension.
Mechanical equipment, ducting, piping and plant-wide HVAC under Petrojet.
USAID hospital renovations, Marriott Amman, Union Tobacco and Al-Deasa: HVAC, fire-fighting, plumbing, medical gases.
Quality, environmental and occupational health & safety management systems certified under UKAC accreditation, covering every service we deliver.
Send drawings, a BOQ or an RFQ and our tendering team will reply with a technical and commercial offer. International EPC contractors looking for a qualified local partner in Jordan are welcome.